B29.300-2015 |
Agricultural, Detachable, and Pintle Chains, Attachments, and Sprockets |
B29.200-2001 |
Welded-Steel-Type Mill Chains, Welded-Steel-Type Drag Chains, Attachments, and Sprocket Teeth (B29.200 - 2001) |
B29.28-2015 |
High Strength Chains for Power Transmission and Tension Linkages |
B29.27-2002 |
Single Pitch and Double Pitch Hollow Pin Conveyor Chains and Attachments (B29.27 - 2002) |
B29.26-2013 |
Fatigue Testing Power Transmission Roller Chain (B29.26 - 2013) |
B29.22-2001 |
Drop Forged Rivetless Chains, Sprocket Teeth Drive Chain/Drive Dogs (B29.22 - 2001) |
B29.21-2013(R2018) |
700 Class Chains, Attachments, and Sprockets for Water and Sewage Treatment Plants (B29.21 - 2013) |
B29.15M-1997 |
Steel Roller Type Conveyor Chains, Attachments, and Sprocket Teeth (B29.15M - 1997) |
B29.10M-1997(R2019) |
Heavy Duty Offset Sidebar Power Transmission Roller Chains and Sprocket Teeth |
B29.8-2010 |
Leaf Chains, Clevises, and Sheaves (B29.8 - 2010) |
B29.2M-2007 |
Inverted Tooth (Silent) Chains and Sprockets (B29.2M - 2007) |
B29.1-2011 |
Precision Power Transmission Roller Chains, Attachments, and Sprockets (B29.1 - 2011) |
PTB-1-2014 |
ASME Section VIII Division 2 Criteria and Commentary (PTB-1 - 2014) |
FE-1-2018 |
Rules for Construction of Fusion Energy Devices |
CSD-2018 |
Controls and Safety Devices for Automatically Fired Boilers |
BPVC.VII-2019 |
Section VII, Recommended Guidelines for the Care of Power Boilers |
BPVC.VI-2019 |
Section VI, Recommended Rules for the Care and Operation of Heating Boilers |
BPVC.IV-2019 |
Section IV, Rules for Construction of Heating Boilers |
BPVC.II.D.M-2019 |
Section II, Materials, Part D, Properties (Metric) |
BPVC.II.D.C-2019 |
Section II, Materials, Part D, Properties (Customary) |
BPVC.II.C-2019 |
Section II, Materials, Part C, Specifications for Welding Rods, Electrodes, and Filler Metals |
BPVC.II.B-2019 |
Section II, Materials, Part B, Nonferrous Material Specifications |
BPVC.II.A-2019 |
Section II, Materials, Part A, Ferrous Material Specifications (Beginning to SA-450) |
BPVC.I-2019 |
Section I, Rules for Construction of Power Boilers |
B31T-2018 |
Standard Toughness Requirements for Piping |
B31.9-2017 |
Building Services Piping |
ASSE 1016-2017/ASME A112.1016-2017/CSA B125.16-17 |
Performance Requirements for Automatic Compensating Valves for Individual Showers and Tub/Shower Combinations |
A112.19.3/CSA B45.4-17-2017 |
Stainless Steel Plumbing Fixtures (with Errata August 2017) |
A112.18.6/CSA B125.6-17-2017 |
Flexible Water Connectors |
A112.6.3-2019 |
Floor and Trench Drains |
A112.6.2-2017 |
Framing-Affixed Supports (Carriers) for Off-the-Floor Plumbing Fixtures |
A112.4.4-2017 |
Plastic Push-Fit Drain, Waste, and Vent (DWV) Fittings |
P30.1-2019 |
Planning for Load Handling Activities |
NUM-1-2016 |
Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type) |
NOG-1-2015 |
Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder) (NOG-1 - 2015) |
HST-6-2015 |
Performance Standard for Air Wire Rope Hoists |
HST-6-2020 |
Performance Standard for Air Wire Rope Hoists |
HST-5-2014 |
Performance Standard for Air Chain Hoists (HST-5 - 2014) |
HST-5-2020 |
Standard Options |
HST-4-2016 |
Performance Standard for Overhead Electric Wire Rope Hoists |
HST-3-1999 |
Performance Standard for Manually Lever Operated Chain Hoists (HST-3 - 1999) |
HST-2-2018 |
Performance Standard for Hand Chain Manually Operated Chain Hoists |
HST-1-2017 |
Performance Standard for Electric Chain Hoists |
HRT-1-2016 |
Rules for Hoisting, Rigging, and Transporting Equipment for Nuclear Facilities |
B30.30-2019 |
Ropes |
B30.29-2018 |
Self-Erecting Tower Cranes |
B30.25-2018 |
Scrap and Material Handlers |
B30.22-2016 |
Articulating Boom Cranes |
B30.21-2014(R2019) |
Lever Hoists (B30.21 - 2014) |
B30.20-2013 |
Below-the-Hook Lifting Devices (B30.20 - 2013) |
B30.18-2016 |
Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist) |
B30.17-2015 |
Cranes and Monorails (With Underhung Trolley or Bridge) |
B30.16-2012 |
Overhead Hoists (Underhung) (B30.16 - 2012) |
B30.14-2015 |
Side Boom Tractors (B30.14 - 2015) |
B30.9-2018 |
Slings |
B30.8-2015 |
Floating Cranes and Floating Derricks (B30.8 - 2015) |
B30.7-2016 |
Winches |
B30.6-2015 |
Derricks (B30.6 - 2015) |
B30.6-2020 |
Derricks |
B30.5-2014 |
Mobile and Locomotive Cranes (B30.5 - 2014) |
B30.4-2015 |
Portal and Pedestal Cranes (B30.4 - 2015) |
B30.4-2020 |
Portal and Pedestal Cranes |
B30.3-2016 |
Tower Cranes |
B30.3-2019 |
Tower Cranes |
B29.24-2002 |
Roller Load Chains for Overhead Hoists (B29.24 - 2002) |
B27.7-1977 |
General Purpose Tapered and Reduced Cross Section Retaining Rings, Metric |
B27.6-1972 |
General Purpose Uniform Cross Section Spiral Retaining Rings |
B18.31.5-2011 |
Bent Bolts (Inch Series) (B18.31.5 - 2011) |
B18.31.4M-2009 |
Threaded Rod (Metric Series) (B18.31.4M - 2009) |
B18.31.3-2014(R2019) |
Threaded Rods (Inch Series) (B18.31.3 - 2014) |
B18.31.1M-2008 |
Metric Continuous and Double-End Studs (B18.31.1M - 2008) |
B18.30.1M-2000 |
Open-End Blind Rivets with Break Mandrels (Metric Series) (B18.30.1M - 2000) |
B18.29.2M-2005 |
Helical Coil Screw Thread Inserts: Free Running and Screw Locking (Metric Series) (B18.29.2M - 2005) |
B18.29.1-2010 |
Helical Coil Screw Thread Inserts--Free Running and Screw Locking (Inch Series) (B18.29.1 - 2010) |
B18.24-2015 |
Part Identifying Number (PIN) Code System Standard for B18 Fastener Products |
B18.24-2020 |
Part Identifying Number (PIN) Code System Standard for B18 Fastener Products |
B18.22M-1981 |
Metric Plain Washers (B18.22M - 1981) |
B18.21.2M-1999 |
Lock Washers (Metric Series) (B18.21.2M - 1999) |
B18.21.1-2009 |
Washers: Helical Spring-Lock, Tooth Lock, and Plain Washers (Inch Series) (B18.21.1 - 2009) |
B18.18-2017 |
Quality Assurance for Fasteners |
B18.16M-2004 |
Prevailing-Torque-Type Steel Metric Hex Nuts and Hex Flange Nuts (B18.16M - 2004) |
B18.16.6-2017 |
Prevailing Torque Locknuts (Inch Series) |
B18.16.4-2008 |
Serrated Hex Flange Locknuts: 90,000 psi (Inch Series) |
B18.13.1M-2011 |
Screw and Washer Assemblies: SEMS (Metric Series) (B18.13.1M - 2011) |
B18.13-2017 |
Screw and Washer Assemblies--SEMS (Inch Series) |
B18.12-2012 |
Glossary of Terms for Mechanical Fasteners (B18.12 - 2012) |
B18.12-2020 |
Glossary of Terms for Mechanical Fasteners |
B18.11-1961 |
Miniature Screws (B18.11 - 1961) |
B18.9-2012 |
Plow Bolts (B18.9 - 2012) |
B18.8.2-2000 |
Taper Pins, Dowel Pins, Straight Pins, Grooved Pins, and Spring Pins (Inch Series) (B18.8.2 - 2000) |
B18.8.1-2014(R2019) |
Clevis Pins and Cotter Pins (Inch Series) (B18.8.1 - 2014) |
B18.7.1M-2007 |
Metric General Purpose Semi-Tubular Rivets (B18.7.1M - 2007) |
B18.7-2007 |
General Purpose Semi-Tubular Rivets, Full Tubular Rivets, Split Rivets, and End Caps (B18.7 - 2007) |
B18.6.9-2010 |
Wing Nuts (Inch Series) (B18.6.9 - 2010) |
B18.6.8-2010 |
Thumb Screws and Wing Screws (Inch Series) (B18.6.8 - 2010) |
B18.6.3-2013 |
Machine Screws, Tapping Screws, and Metallic Drive Screws (Inch Series) (B18.6.3 - 2013) |
B18.6.1-1981 |
Wood Screws (Inch Series) (B18.6.1 - 1981) |
B18.5.2.2M-1982 |
Metric Round Head Square Neck Bolts (B18.5.2.2M - 1982) |
B18.5.2.1M-2006 |
Metric Round Head Short Square Neck Bolts (B18.5.2.1M - 2006) |
B18.5-2012 |
Round Head Bolts (Inch Series) (B18.5 - 2012) |
B18.3-2012 |
Socket Cap, Shoulder, Set Screws, and Hex Keys (Inch Series) (B18.3 - 2012) |
B18.2.8-1999 |
Clearance Holes for Bolts Screws and Studs (B18.2.8 - 1999) |
B18.2.7.1M-2002 |
Metric 12-Spline Flange Screws (B18.2.7.1M - 2002) |
B18.2.6M-2012 |
Metric Fasteners for Use in Structural Applications (B18.2.6M - 2012) |
B18.2.6-2019 |
Fasteners for Use in Structural Applications |
B18.2.5M-2013 |
Metric 12-Point Flange Head Screws (B18.2.5M - 2013) |
B18.2.4.3M-1979 |
Metric Slotted Hex Nuts (B18.2.4.3M - 1979) |
B18.2.3.9M-2001 |
Metric Heavy Hex Flange Screws (B18.2.3.9M - 2001) |
B18.2.3.6M-1979 |
Metric Heavy Hex Bolts (B18.2.3.6M - 1979) |
B18.2.3.5M-1979 |
Metric Hex Bolts (B18.2.3.5M - 1979) |
B18.2.3.4M-2001 |
Metric Hex Flange Screws (B18.2.3.4M - 2001) |
B18.2.3.2M-2005 |
Metric Formed Hex Screws (B18.2.3.2M - 2005) |
B18.2.2-2015 |
Nuts for General Applications: Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series) |
B18.1.2-1972 |
Large Rivets (B18.1.2 - 1972) |
B18.1.1-1972 |
Small Solid Rivets (B18.1.1 - 1972) |
B16.15-2018 |
Cast Copper Alloy Threaded Fittings: Classes 125 and 250 |
MFC-22-2007 |
Measurement of Liquid by Turbine Flowmeters (MFC-22 - 2007) |
MFC-21.1-2015(R2020) |
MFC-21.1 - 2015 Measurement of Gas Flow by Means of Capillary Tube Thermal Mass Flowmeters and Mass Flow Controllers |
MFC-19G-2008 |
Wet Gas Flowmetering Guideline (Technical Report) (MFC-19G - 2008) |
MFC-18M-2001 |
Measurement of Fluid Flow using Variable Area Meters (MFC-18M - 2001) |
MFC-16-2014(R2019) |
Measurement of Liquid Flow in Closed Conduits with Electromagnetic Flowmeters (MFC-16 - 2014) |
MFC-14M-2003(R2018) |
Measurement of Fluid Flow Using Small Bore Precision Orifice Meters (MFC-14M - 2003) |
MFC-13M-2006 |
Measurement of Fluid Flow in Closed Conduits: Tracer Methods (MFC-13M - 2006) |
MFC-12M-2006 |
Measurement of Fluid Flow in Closed Conduits Using Multiport Averaging Pitot Primary Elements (MFC-12M - 2006) |
MFC-11-2006 |
Measurement of Fluid Flow by Means of Coriolis Mass Flowmeters (MFC-11 - 2006) |
MFC-10M-2000 |
Method for Establishing Installation Effects on Flow Meters (MFC-10M - 2000) |
MFC-9M-1988 |
Measurement of Liquid Flow in Closed Conduits by Weighing Method (MFC-9M - 1988) |
MFC-8M-2001 |
Fluid Flow in Closed Conduits: Connections for Pressure Signal Transmissions Between Primary & Secondary Devices (MFC-8M - 2001) |
MFC-7M-1987 |
Measurement of Gas Flow by Means of Critical Flow Venturi Nozzles (MFC-7M - 1987) |
MFC-7-2016 |
Measurement of Gas Flow by Means of Critical Flow Venturis and Critical Flow Nozzles |
MFC-6-2013 |
Measurement of Fluid Flow in Pipes Using Vortex Flowmeters (MFC-6 - 2013) |
MFC-4M-1986 |
Measurement of Gas Flow by Turbine Meters (MFC-4M - 1986) |
MFC-3M-1989 |
Measurement Of Fluid Flow In Pipes Using Orifice, Nozzle & Venturi (MFC-3M - 1989) |
MFC-2M-1983 |
Measurement Uncertainty for Fluid Flow in Closed Conduits (MFC-2M - 1983) |
MFC-1M-2003 |
Glossary of Terms used in the Measurement of Fluid Flow in Pipes (MFC-1M - 2003) |
MFC-1-2014 |
Glossary of Terms Used in the Measurement of Fluid Flow in Pipes (MFC-1 - 2014) |
TDP-1-2013 |
Prevention of Water Damage to Steam Turbines Used for Electric Power Generation: Fossil-Fuel Plants |
RAM-2-2016 |
Reliability, Availability, and Maintainability Program Development Process for Existing Power Plants |
RAM-1-2013 |
Reliability, Availability, and Maintainability of Equipment and Systems in Power Plants (RAM-1 - 2013) |
PTC 47.4-2015(R2020) |
Power Block of an Integrated Gasification Combined Cycle Power Plant |
PTC 47-2006 |
Integrated Gasification Combined Cycle Power Generation Plants (PTC 47 - 2006) |
PTC 12.2-2010(R2020) |
Steam Surface Condensers (PTC 12.2 - 2010) |
PTC 4.2-1969 |
Coal Pulverizers (PTC 4.2 - 1969) |
POM 102-2014(R2019) |
Operating Walkdowns of Power Plants (POM 102 - 2014) |
POM 101-2013(R2019) |
Performance-Related Outage Inspections (POM 101 - 2013) |
PCC-3-2017 |
Inspection Planning Using Risk-Based Methods |
PCC-1-2019 |
Guidelines for Pressure Boundary Bolted Flange Joint Assembly |
BPVC.XII-2019 |
Section XII, Rules for Construction and Continued Service of Transport Tanks |
BPVC.X-2019 |
Section X, Fiber-Reinforced Plastic Pressure Vessels |
BPVC.VIII.3-2019 |
Section VIII, Rules for Construction of Pressure Vessels, Division 3, Alternative Rules for Construction of High Pressure Vessels |
BPVC.VIII.2-2019 |
Section VIII, Rules for Construction of Pressure Vessels, Division 2, Alternative Rules |
BPVC.VIII.1-2019 |
Section VIII, Rules for Construction of Pressure Vessels, Division 1 |
BPVC.V-2019 |
Section V, Nondestructive Examination |
B31.1-2018 |
Power Piping |
B31.1-2020 |
Power Piping |
B5.61-2003(R2019) |
Power Presses: General Purpose, Single-Action, Straight Side Type |
B5.60-2014(R2019) |
Workholding Chucks: Jaw-Type Chucks |
B5.57-2012 |
Methods for Performance Evaluation of Computer Numerically Controlled Lathes and Turning Centers (B5.57 - 2012) |
B5.55M-1994 |
Specification and Performance Standard Power Press Brakes (B5.55M - 1994) |
B5.52-2003(R2019) |
Power Presses: General Purpose, Single-Point Gap Type (B5.52 - 2003) |
B5.50-2015 |
7/24 Taper Tool to Spindle Connection for Automatic Tool Change (B5.50 - 2015) |
B5.48-1977 |
Ball Screws (B5.48 - 1977) |
B5.40-1977 |
Spindle Noses and Tool Shanks for Horizontal Boring Machines (B5.40 - 1977) |
B5.18-1972 |
Spindle Noses and Tool Shanks for Milling Machines (B5.18 - 1972) |
B5.10-1994 |
Machine Tapers-Self Holding and Steep Taper Series (B5.10 - 1994) |
B5.9-1967 |
Spindle Noses for Tool Room Lathes, Engine Lathes, Turret Lathes and Automatic Lathes (B5.9 - 1967) |
B5.8-2001 |
Chuck and Chuck Jaws (B5.8 - 2001) |
B5.1M-1985 |
T-Slots, Their Bolts, Nuts and Tongue (B5.1M - 1985) |
QME-1-2012 |
Qualification of Active Mechanical Equipment Used in Nuclear Facilities (QME-1 - 2012) |
OM-2017 |
Operation and Maintenance of Nuclear Power Plants |
OM-2020 |
Operation and Maintenance of Nuclear Power Plants |
NML-1-2019 |
Rules for the Movement of Loads Using Overhead Handling Equipment in Nuclear Facilities |
BPVC.XI.2-2019 |
Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants |
BPVC.XI.1-2019 |
Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, Division 1, Rules for Inspection and Testing of Components of Light-Water-Cooled Plants |
BPVC.XI-2017 |
Rules for Inservice Inspection of Nuclear Power Plant Components |
BPVC.III.NCA-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Subsection NCA, General Requirements for Division 1 and Division 2 |
BPVC.III.A-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Subsection NCA, General Requirements for Division 1 and Division 2 |
BPVC.III.5-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 5, High Temperature Reactors |
BPVC.III.3-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 3, Containment Systems for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material |
BPVC.III.2-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 2, Code for Concrete Containments |
BPVC.III.1.NG-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NG, Core Support Structures |
BPVC.III.1.NF-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NF, Supports |
BPVC.III.1.NE-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NE, Class MC Components |
BPVC.III.1.ND-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection ND, Class 3 Components |
BPVC.III.1.NC-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NC, Class 2 Components |
BPVC.III.1.NB-2019 |
Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NB, Class 1 Components |
AG-1-2019 |
Code on Nuclear Air and Gas Treatment |
B16.52-2018 |
Forged Nonferrous Fittings, Socket-Welding and Threaded (Titanium, Titanium Alloys, Aluminum, and Aluminum Alloys) |
B16.51-2018 |
Copper and Copper Alloy Press-Connect Pressure Fittings |
B16.50-2018 |
Wrought Copper and Copper Alloy Braze-Joint Pressure Fittings |
B16.49-2017 |
Factory-Made, Wrought Steel, Buttwelding Induction Bends for Transportation and Distribution Systems |
B16.42-2016 |
Ductile Iron Pipe Flanges and Flanged Fittings: Classes 150 and 300 |
B16.39-2019 |
Malleable Iron Threaded Pipe Unions |
B16.29-2017 |
Wrought Copper and Wrought Copper Alloy Solder-Joint Drainage Fittings--DWV |
B16.26-2018 |
Cast Copper Alloy Fittings for Flared Copper Tubes |
B16.25-2017 |
Buttwelding Ends |
B16.24-2016 |
Cast Copper Alloy Pipe Flanges, Flanged Fittings, and Valves: Classes 150, 300, 600, 900, 1500, and 2500 |
B16.23-2016 |
Cast Copper Alloy Solder Joint Drainage Fittings: DWV |
B16.22-2018 |
Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings |
B16.20-2017 |
Metallic Gaskets for Pipe Flanges |
B16.18-2018 |
Cast Copper Alloy Solder Joint Pressure Fittings B16.18 - 2018 |
B16.14-2018 |
Ferrous Pipe Plugs, Bushings, and Locknuts with Pipe Threads |
B16.12-2019 |
Cast Iron Threaded Drainage Fittings |
B16.11-2016 |
Forged Fittings, Socket-Welding and Threaded |
B16.10-2017 |
Face-to-Face and End-to-End Dimensions of Valves |
B16.9-2018 |
Factory-Made Wrought Buttwelding Fittings |
B16.4-2016 |
Gray Iron Threaded Fittings: Classes 125 and 150 |
B16.3-2016 |
Malleable Iron Threaded Fittings: Classes 150 and 300 |
B16.1-2015 |
Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and 250 |
B16.1-2020 |
Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and 250 |
V V 20-2009 |
Standard for Verification and Validation in Computational Fluid Dynamics and Heat Transfer (V V 20 - 2009) |
V V 10-2019 |
Standard for Verification and Validation in Computational Solid Mechanics |
PTC PM-2010 |
Performance Monitoring Guidelines for Power Plants (PTC PM - 2010) |
PTC 70-2009(R2019) |
Ramp Rates |
PTC 47.2-2019 |
Gasification Block of an Integrated Gasification Combined Cycle Power Plant |
PTC 47.1-2017 |
Cryogenic Air Separation Unit of an Integrated Gasification Combined Cycle Power Plant |
PTC 46-2015 |
Overall Plant Performance |
PTC 40-2017 |
Flue Gas Desulfurization Units |
PTC 39-2005 |
Steam Traps (PTC 39 - 2005) |
PTC 36-2018 |
Measurement of Industrial Noise |
PTC 34-2017 |
Waste Combustors with Energy Recovery |
PTC 31-2011 |
High-Purity Water Treatment Systems (PTC 31 - 2011) |
PTC 30.1-2007 |
Air-Cooled Steam Condensers (PTC 30.1 - 2007) |
PTC 30-1991 |
Air Cooled Heat Exchangers (ACHE) (PTC 30 - 1991) |
PTC 23-2003 |
Atmospheric Water Cooling Equipment (PTC 23 - 2003) |
PTC 22-2014 |
Gas Turbines (PTC 22 - 2014) |
PTC 19.23-1980 |
Guidance Manual for Model Testing (PTC 19.23 - 1980) |
PTC 19.6-2018 |
Electrical Power Measurements |
PTC 19.2-2010(R2020) |
Pressure Measurement (PTC 19.2 - 2010) |
PTC 18-2011 |
Hydraulic Turbines and Pump-Turbines (PTC 18 - 2011) |
PTC 12.5-2000 |
Single Phase Heat Exchangers (PTC 12.5 - 2000) |
PTC 12.4-1992(R2019) |
Moisture Separator Reheaters |
PTC 12.3-1997(R2019) |
Performance Test Code on Deaerators |
PTC 12.1-2015 |
Closed Feedwater Heaters |
PTC 11-2008(R2018) |
Fans (PTC 11 - 2008) |
PTC 10-1997 |
Performance Test Code on Compressors and Exhausters (PTC 10 - 1997) |
PTC 8.2-1990 |
Centrifugal Pumps (PTC 8.2 - 1990) |
PTC 6S-1988(R2019) |
Procedures for Routine Performance Test of Steam Turbines |
PTC 6-2004 |
Steam Turbines (PTC 6 - 2004) |
PTC 4.3-2017 |
Air Heaters |
PTC 4-2013 |
Fired Steam Generators (PTC 4 - 2013) |
PTC 2-2001 |
Definitions and Values Code (PTC 2 - 2001) |
PTC 1-2015 |
General Instructions (PTC 1 - 2015) |
PTC 25-2018 |
Pressure Relief Devices |
PTC 19.5-2004 |
Flow Measurement (PTC 19.5 - 2004) |
PTC 19.3 TW-2016 |
Thermowells |
PTB-9-2014 |
ASME Pipeline Standards Compendium (PTB-9 - 2014) |
NM.3.3-2018 |
Nonmetallic Materials, Part 3--Properties |
NM.3.2-2018 |
Nonmetallic Materials, Part 2--Reinforced Thermoset Plastic Material Specifications |
NM.3.1-2018 |
Nonmetallic Materials, Part 1--Thermoplastic Material Specifications |
NM.2-2018 |
Glass-Fiber-Reinforced Thermosetting-Resin Piping Systems |
NM.1-2018 |
Thermoplastic Piping Systems |
FFS-2-2009 |
Fitness-for-Service Example Problem Manual (FFS-2 - 2009) |
FFS-1-2007 |
Fitness-For-Service (FFS-1 - 2007) |
B31J-2017 |
Stress Intensification Factors (i-Factors), Flexibility Factors (k-Factors), and Their Determination for Metallic Piping Components |
B31.11-2002 |
Slurry Transportation Piping Systems (B31.11 - 2002) |
B31.8-2018 |
Gas Transmission and Distribution Piping Systems |
B31.5-2019 |
Refrigeration Piping and Heat Transfer Components |
B31.3_ES-2010 |
Tuberías de proceso (Spanish) (B31.3_ES - 2010) |
B31.3-2018 |
Process Piping |
B16.5-2017 |
Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard |
API 579-1/ASME FFS-1-2016 |
Fitness-For-Service |
B31.T-2010 |
Standard Toughness Requirements for Piping (B31T - 2010) |
B31.Q_ES-2010 |
Calificación del personal de líneas de tuberías (Spanish) (B31Q_ES - 2010) |
B31.Q-2014 |
Pipeline Personnel Qualification (B31Q - 2014) |
B31.J_ES-2008 |
Método de prueba estándar para determinar factores de intensificación de esfuerzo (Factores i) para componentes de tuberías metálicas (Spanish) (B31J_ES - 2008) |
B31.J-2008 |
Standard Test Method for Determining Stress Intensification Factors (i-Factors) for Metallic Piping Components (B31J - 2008) |
B31.G_ES-2012 |
Manual para la determinación de la Resistencia remanente de tuberías corroídas (Spanish) (B31G_ES - 2012) |
B31.G-2012 |
Manual for Determining the Remaining Strength of Corroded Pipelines (B31G - 2012) |
B31.E-2008 |
Standard for the Seismic Design and Retrofit of Above-Ground Piping Systems (B31E - 2008) |
ASSE 1002-2020/ASME A112.1002-2020/CSA B125.12:20 |
Anti-Siphon Fill Valves for Water Closet Tanks |
A112.1016/CSA B125.16-2011 |
Performance Requirements for Automatic Compensating Valves for Individual Showers and Tub/Shower Combinationswith Update No. 2) |
A112.36.2M-1991 |
Cleanouts |
A112.21.3M-1985 |
Hydrants for Utility and Maintenance use |
A112.21.2M-1983 |
Roof Drains |
A112.19.19-2006 |
Vitreous China Nonwater Urinals |
A112.19.19-2016 |
Vitreous China Nonwater Urinals |
A112.19.17-2010(R2018) |
Manufactured Safety Vacuum Release SystemsSVRS) for Residential and Commercial Swimming Pool, Spa, Hot Tub, and Wading Pool Suction Systems |
A112.19.15-2012 |
Bathtubs/Whirlpool Bathtubs with Pressure Sealed Doors |
A112.19.14-2013(R2018) |
Six-Liter Water Closets Equipped with a Dual Flushing Device |
A112.19.12-2014(R2019) |
Wall Mounted, Pedestal Mounted, Adjustable, Elevating, Tilting, and Pivoting Lavatory, Sink, and Shampoo Bowl Carrier Systems and Drain Waste Systems |
A112.19.10-2017 |
Retrofit Dual Flush Devices for Water Closets |
A112.19.9M-1991 |
Non-Vitreous Ceramic Plumbing Fixtures |
A112.19.7/CSA B45.10-12-2012 |
Hydromassage Bathtub Systems |
A112.19.7/CSA B45.10-2020 |
Hydromassage Bathtub Systems |
A112.19.6-1995 |
Hydraulic Performance Requirements for Water Closets and Urinals |
A112.19.5/CSA B45.15-2011 |
Flush Valves and Spuds for Water Closets, Urinals, and Tankswith Update No.1) |
A112.19.3/CSA B45.4-2008 |
Stainless Steel Plumbing Fixtures |
A112.19.3-2000 |
Stainless Steel Plumbing FixturesDesigned for Residential Use) |
A112.19.2/CSA B45.1-2013 |
Ceramic Plumbing Fixtureswith Update No. 1) |
A112.19.2-2018/CSA B45.18 |
Ceramic Plumbing Fixtures |
A112.19.1/CSA B45.2-2013 |
Enamelled Cast Iron and Enamelled Steel Plumbing Fixtures |
A112.19.1-2018/CSA B45.2-18 |
Enamelled Cast Iron and Enamelled Steel Plumbing Fixtures |
A112.18.9-2011 |
Protectors/Insulators for Exposed Waste and Supplies on Accessible Fixtures |
A112.18.8-2020 |
Sanitary Waste Valves for Plumbing Drainage Systems |
A112.18.6/CSA B125.6-2009 |
Flexible Water Connectors |
A112.18.3-2002 |
Performance Requirements for Backflow Protection Devices and Systems in Plumbing Fixture Fittings |
A112.18.2/CSA B125.2-2015(R2019) |
Plumbing Waste Fittings |
A112.18.2-2020/CSA B125.2:20 |
Plumbing Waste Fittings |
A112.18.1/CSA B125.1-2018 |
Plumbing Supply Fittings |
A112.14.6-2010(R2019) |
FOGFats, Oils, and Greases) Disposal Systems |
A112.14.4-2001 |
Grease Removal Devices |
A112.14.3-2018 |
Hydromechanical Grease Interceptors |
A112.14.1-2003 |
Backwater Valves |
A112.6.9-2005(R2019) |
Siphonic Roof Drains |
A112.6.7-2010(R2019) |
Sanitary Floor Sinks |
A112.6.4-2003 |
Roof, Deck, and Balcony Drains |
A112.6.1M-1997 |
Floor Affixed Supports for Off-the-Floor Plumbing Fixtures for Public Use |
A112.4.14-2004 |
Manually Operated, Quarter-Turn Shutoff Valves for Use in Plumbing Systems |
A112.4.3-1999 |
Plastic Fittings for Connecting Water Closets to the Sanitary Drainage System |
ASME A112.4.2/CSA B45.16-2015 |
Personal Hygiene Devices for Water Closets |
A112.4.2-2015/CSA B45.16-15(R2020) |
Personal Hygiene Devices for Water Closets |
A112.4.1-2009(R2019) |
Water Heater Relief Valve Drain Tubes |
A112.3.4/CSA B45.9-2018 |
Plumbing Fixtures with Pumped Waste and Macerating Toilet Systems |
A112.3.1-2007 |
Stainless Steel Drainage Systems for Sanitary DWV, Storm, and Vacuum Applications, Above- and Below Ground |
A112.1.3-2000(R2019) |
Air Gap Fittings for use with Plumbing Fixtures, Appliances, and Appurtenances |
A112.1.2-2012 |
Air Gaps in Plumbing Systemsfor Plumbing Fixtures and Water-Connected Receptors) |
B47.1-2007 |
Gage Blanks (B47.1 - 2007) |
B18.31.2-2008(R2019) |
Continuous and Double-End Studs (Inch Series) (B18.31.2 - 2008) |
B1.30-2002 |
Screw Threads: Standard Practice for Calculating and Rounding Dimensions (B1.30 - 2002) |
B1.22M-1985 |
Gages and Gaging for MJ Metric Screw Threads (B1.22M - 1985) |
B1.21M-1997(R2018) |
Metric Screw Threads: MJ Profile (B1.21M - 1997) |
B1.20.7-1991(R2018) |
Hose Coupling Screw Threads, Inch (B1.20.7 - 1991) |
B1.20.2M-2006 |
Pipe Threads, 60 deg. General Purpose (Metric) (B1.20.2M - 2006) |
B1.20.1-2013 |
Pipe Threads, General Purpose, Inch (B1.20.1 - 2013) |
B1.16M-1984 |
Gages and Gaging for Metric M Screw Threads (B1.16M - 1984) |
B1.15-1995 |
Unified Inch Screw Threads, (UNJ Thread Form) (B1.15 - 1995) |
B1.13M-2005 |
Metric Screw Threads: M Profile (B1.13M - 2005) |
B1.12-1987(R2018) |
Class 5 Interference-Fit Thread (B1.12 - 1987) |
B1.11-1958 |
Microscope Objective Thread (B1.11 - 1958) |
B1.10M-2004(R2019) |
Unified Miniature Screw Threads (B1.10M - 2004) |
B1.9-1973 |
Buttress Inch Screw Threads (7 deg./45 deg. Form with 0.6 Pitch Basic Height of Thread Engagement) (B1.9 - 1973) |
B1.8-1988 |
Stub Acme Screw Threads (B1.8 - 1988) |
B1.7-2006 |
Screw Threads: Nomenclature, Definitions, and Letter Symbols (B1.7 - 2006) |
B1.5-1997 |
Acme Screw Threads (B1.5 - 1997) |
B1.3M-1992 |
Screw Thread Gaging Systems for Dimensional Acceptability - Inch Metric Screw Threads (UN UNR UNJ, M & MJ] (B1.3M - 1992) |
B1.3-2007 |
Screw Thread Gaging Systems for Acceptability: Inch and Metric Screw Threads (UN, UNR, UNJ, M, and MJ) (B1.3 - 2007) |
B1.2-1983 |
Gages and Gaging for Unified Inch Screw Threads (B1.2 - 1983) |
B1.1-2003(R2018) |
Unified Inch Screw Threads, (UN and UNR Thread Form) (B1.1 - 2003) |
B1.1-2019 |
Unified Inch Screw Threads (UN, UNR, and UNJ Thread Forms) |